Harrods

87–135 Brompton Road, Knightsbridge, London SW1X 7XL

  • Harrods

Contract Details

Client:
Jaysam Contractors Ltd

Contract Period:
July 2013 – October 2013

Contract Value:
£53k

Harrods

Harrods is close to unveiling the first phase of a £200 million overhaul ordered by its new Qatari owners.The listed building status meant that Harrods executives had to consult English Heritage on almost every aspect of the restoration, down to the width of the glazing bars in a new skylight. The installation of the escalator by Make architects has allowed windows to be reopened that had been bricked up since the Eighties, TRC carried out the refurbishment of these windows which included replacing the existing glass to a bomb and solar reflective type, full decoration internal and external along with replacing and refurbishing the existing ironmongery.